Navigation map. 27 items. Rondônia: —; Acre: —; Amazonas: —; Roraima: —; Pará: —; Amapá: —; Tocantins: —; Maranhão: —; Piauí: —; Ceará: —. and 17 more.
REGISTERED POLL · PE · 2020
PE045652020
Registered by POTENCIAL CONSULTORIA E PESQUISAS LTDA (POTENCIAL CONSULTORIA E PESQUISAS) on Jul 3, 2020; fieldwork from Jul 4, 2020 to Jul 8, 2020, a sample of 600 interviews.
Key figures
Sample
Sample. 1 item. Highest: interviews, 600. Lowest: interviews, 600. interviews: 600.
600
Declared cost
Declared cost. 1 item. Highest: Declared cost, R$13,500. Lowest: Declared cost, R$13,500. Declared cost: R$13,500.
R$13,500
Fieldwork days
Fieldwork days. 1 item. Highest: Fieldwork days, 5. Lowest: Fieldwork days, 5. Fieldwork days: 5.
5
Commissioners
Commissioners. 1 item. Highest: Commissioners, 1. Lowest: Commissioners, 1. Commissioners: 1.
1
§ 01Estimates
Results coming soon
Estimates
This poll is registered with the TSE, but its published figures haven't been added to civism yet. Meanwhile, the registration details are below: pollster, sponsor, sample and fieldwork dates.
§ 02Record
Record
Record
Record. 8 items. Institute: POTENCIAL CONSULTORIA E PESQUISAS LTDA (POTENCIAL CONSULTORIA E PESQUISAS); CNPJ: 09.026.259/0001-86; Statistician: José Carlos Martins Leite; CONRE: 8707; Scope: PE · UE 24910; Offices: Prefeito; Own poll: No; Municipal data: No.
- CNPJ
- 09.026.259/0001-86
- Statistician
- José Carlos Martins Leite
- CONRE
- 8707
- Scope
- PE · UE 24910
- Offices
- Prefeito
- Own poll
- No
- Municipal data
- No
Timeline
Timeline. 3 items. Registered: Jul 3, 2020; Fieldwork start: Jul 4, 2020; Fieldwork end: Jul 8, 2020.
- Registered
- Fieldwork start
- Fieldwork end
§ 03Who paid
Who paid
Who paid
Who paid. 2 items. Highest: POTENCIAL CONSULTORIA E PESQUISAS LTDA (09.026.259/0001-86), R$0 · -0.00%. Lowest: POTENCIAL CONSULTORIA E PESQUISAS LTDA (09.026.259/0001-86), -R$1 · 100.00%. Total: -1. POTENCIAL CONSULTORIA E PESQUISAS LTDA (09.026.259/0001-86): R$0 · -0.00%; POTENCIAL CONSULTORIA E PESQUISAS LTDA (09.026.259/0001-86): -R$1 · 100.00%.
§ 04Method
Method
Method
Metodologia
Plano amostral
O plano amostral foi desenvolvido considerando um nível de confiança de 95% (int…
Sistema de controle
§ 05Contests concerned
Contests concerned
Contests concerned
Contests concerned. 1 item. prefeitura-olinda-pe-2020: Offices: Mayor; Place: olinda-pe.
| Contests concerned | Offices | Place |
|---|---|---|
| prefeitura-olinda-pe-2020 | Mayor | olinda-pe |
§ 06Connections
Connections. 4 items. Highest: Pollsters, 1; POTENCIAL CONSULTORIA E PESQUISAS LTDA (POTENCIAL CONSULTORIA E PESQUISAS). Lowest: Pollsters, 1; POTENCIAL CONSULTORIA E PESQUISAS LTDA (POTENCIAL CONSULTORIA E PESQUISAS). Pollsters: 1; POTENCIAL CONSULTORIA E PESQUISAS LTDA (POTENCIAL CONSULTORIA E PESQUISAS); Elections: 1; 2020-municipais; Contests concerned: 1; prefeitura-olinda-pe-2020; Place: 1; Olinda-Pe.