Navigation map. Unit: value. 27 items. Rondônia: —; Acre: —; Amazonas: —; Roraima: —; Pará: —; Amapá: —; Tocantins: —; Maranhão: —; Piauí: —; Ceará: —. and 17 more.
REGISTERED POLL · GO · 2012
GO001512012
Above: Polls 2012EPP - EMPRESA DE PESQUISA E CONSULTORIA LTDA2012-municipais
Below: 1 contests concerned
Registered by EPP - EMPRESA DE PESQUISA E CONSULTORIA LTDA on Aug 28, 2012; fieldwork from Aug 25, 2012 to Aug 26, 2012, a sample of 512 interviews.
Key figures
Sample
Sample. Unit: value. 1 items. Highest: interviews, 512. Lowest: interviews, 512. Total: 512. interviews: 512.
512
Declared cost
Declared cost. Unit: value. 1 items. Highest: Declared cost, R$4,500. Lowest: Declared cost, R$4,500. Total: 4,500. Declared cost: R$4,500.
R$4,500
Fieldwork days
Fieldwork days. Unit: value. 1 items. Highest: Fieldwork days, 2. Lowest: Fieldwork days, 2. Total: 2. Fieldwork days: 2.
2
Commissioners
Commissioners. Unit: value. 1 items. Highest: Commissioners, 1. Lowest: Commissioners, 1. Total: 1. Commissioners: 1.
1
§ 01Estimates
Results coming soon
Estimates
This poll is registered with the TSE, but its published figures haven't been added to civism yet. Meanwhile, the registration details are below: pollster, sponsor, sample and fieldwork dates.
§ 02Record
Record
Record
Record. Unit: value. 8 items. Institute: EPP - EMPRESA DE PESQUISA E CONSULTORIA LTDA; CNPJ: 01.403.730/0001-04; Statistician: Alexandre Vasconcelos Lima; CONRE: 8631 - CONRE/DF; Scope: GO · UE 93793; Offices: Prefeito; Own poll: No; Municipal data: No.
- CNPJ
- 01.403.730/0001-04
- Statistician
- Alexandre Vasconcelos Lima
- CONRE
- 8631 - CONRE/DF
- Scope
- GO · UE 93793
- Offices
- Prefeito
- Own poll
- No
- Municipal data
- No
Timeline
Timeline. Unit: value. 3 items. Registered: Aug 28, 2012; Fieldwork start: Aug 25, 2012; Fieldwork end: Aug 26, 2012.
- Registered
- Fieldwork start
- Fieldwork end
§ 03Who paid
Who paid
Who paid
Who paid. Unit: value. 2 items. Highest: RAIMUNDO EUDES DE ASSIS, R$0 · -0.00%. Lowest: RAIMUNDO EUDES DE ASSIS, -R$3 · 100.00%. Total: -3. RAIMUNDO EUDES DE ASSIS: R$0 · -0.00%; RAIMUNDO EUDES DE ASSIS: -R$3 · 100.00%.
§ 04Method
Method
Method
Metodologia
Plano amostral
a)Margem de erro = 4,0% (para mais ou para menos) b)Nível de confiança =95,0% c…
Sistema de controle
§ 05Contests concerned
Contests concerned
Contests concerned
Contests concerned. Unit: value. 1 items. prefeitura-goiatuba-go-2012: Offices: Mayor; Place: goiatuba-go.
| Contests concerned | Offices | Place |
|---|---|---|
| prefeitura-goiatuba-go-2012 | Mayor | goiatuba-go |
§ 06Connections
Connections. Unit: value. 4 items. Highest: Pollsters, 1; EPP - EMPRESA DE PESQUISA E CONSULTORIA LTDA. Lowest: Pollsters, 1; EPP - EMPRESA DE PESQUISA E CONSULTORIA LTDA. Total: 4. Pollsters: 1; EPP - EMPRESA DE PESQUISA E CONSULTORIA LTDA; Elections: 1; 2012-municipais; Contests concerned: 1; prefeitura-goiatuba-go-2012; Place: 1; Goiatuba-go.
- GO001512012
Pollsters1
Elections1
Contests concerned1
Place1