Skip to content
civism

Navigation map. Unit: value. 27 items. Rondônia: —; Acre: —; Amazonas: —; Roraima: —; Pará: —; Amapá: —; Tocantins: —; Maranhão: —; Piauí: —; Ceará: —. and 17 more.

REGISTERED POLL · BR · 2018

BR011052018

Registered by CM7 SERVICOS DE COMUNICACAO LTDA (CM7 COMUNICACAO E CRIACAO) on Dec 31, 2021; fieldwork from Dec 22, 2021 to Dec 28, 2021, a sample of 3,000 interviews.

Key figures

Sample

Sample. Unit: value. 1 items. Highest: interviews, 3,000. Lowest: interviews, 3,000. Total: 3,000. interviews: 3,000.

3,000

interviews

TSE · pesquisas

Declared cost

Declared cost. Unit: value. 1 items. Highest: Declared cost, R$8,500. Lowest: Declared cost, R$8,500. Total: 8,500. Declared cost: R$8,500.

R$8,500

TSE · pesquisas

Fieldwork days

Fieldwork days. Unit: value. 1 items. Highest: Fieldwork days, 7. Lowest: Fieldwork days, 7. Total: 7. Fieldwork days: 7.

7

TSE · pesquisas

Commissioners

Commissioners. Unit: value. 1 items. Highest: Commissioners, 1. Lowest: Commissioners, 1. Total: 1. Commissioners: 1.

1

TSE · pesquisas

§ 01Estimates

Results coming soon

Estimates

This poll is registered with the TSE, but its published figures haven't been added to civism yet. Meanwhile, the registration details are below: pollster, sponsor, sample and fieldwork dates.

§ 02Record

Record

Record

Record. Unit: value. 8 items. Institute: CM7 SERVICOS DE COMUNICACAO LTDA (CM7 COMUNICACAO E CRIACAO); CNPJ: 18.431.026/0001-50; Statistician: Heitor Lopes Moura; CONRE: 10185; Scope: BR · UE BR; Offices: Presidente; Own poll: —; Municipal data: No.

CNPJ
18.431.026/0001-50
Statistician
Heitor Lopes Moura
CONRE
10185
Scope
BR · UE BR
Offices
Presidente
Own poll
—
Municipal data
No

TSE · pesquisas

Timeline

Timeline. Unit: value. 3 items. Registered: Dec 31, 2021; Fieldwork start: Dec 22, 2021; Fieldwork end: Dec 28, 2021.

  1. Dec 31, 2021Registered
  2. Dec 22, 2021Fieldwork start
  3. Dec 28, 2021Fieldwork end

TSE · pesquisas

§ 03Who paid

Who paid

Who paid

Who paid. Unit: value. 2 items. Highest: CM7 SERVICOS DE COMUNICACAO LTDA (18.431.026/0001-50), R$0 · -0.00%. Lowest: CM7 SERVICOS DE COMUNICACAO LTDA (18.431.026/0001-50), -R$1 · 100.00%. Total: -1. CM7 SERVICOS DE COMUNICACAO LTDA (18.431.026/0001-50): R$0 · -0.00%; CM7 SERVICOS DE COMUNICACAO LTDA (18.431.026/0001-50): -R$1 · 100.00%.

TSE · pesquisas

§ 04Method

Method

Method

Metodologia

PESQUISA QUANTITATIVA COM FORMULÁRIO IMPRESSO

Plano amostral

A MARGEM DE ERRO DE 3% PARA MAIS OU PARA MENOS, COM GRAU DE CONFIABILIDADE DE 98%

Sistema de controle

FOI MONTADA EQUIPES ESPECÍFICAS PARA CADA ZONA COM UM COORDENADOR, AO FIM DO DIA, OS FORMULÁRIOS ERAM CONFERIDOS E REPASSADOS PARA O ESTATÍSTICO RESPONSÁVEL

TSE · pesquisas

§ 05Contests concerned

Contests concerned

Contests concerned

Contests concerned. Unit: value. 2 items. presidente-brasil-2018: Offices: President; Place: brasil; presidente-brasil-2018-turno-2: Offices: President; Place: brasil.

Contests concerned
Contests concernedOfficesPlace
presidente-brasil-2018Presidentbrasil
presidente-brasil-2018-turno-2Presidentbrasil

TSE · 2018

§ 06Connections

Connections. Unit: value. 3 items. Highest: Contests concerned, 2; presidente-brasil-2018; presidente-brasil-2018-turno-2. Lowest: Pollsters, 1; CM7 SERVICOS DE COMUNICACAO LTDA (CM7 COMUNICACAO E CRIACAO). Total: 4. Pollsters: 1; CM7 SERVICOS DE COMUNICACAO LTDA (CM7 COMUNICACAO E CRIACAO); Elections: 1; 2018-gerais; Contests concerned: 2; presidente-brasil-2018; presidente-brasil-2018-turno-2.