Navigation map. Unit: value. 27 items. Rondônia: —; Acre: —; Amazonas: —; Roraima: —; Pará: —; Amapá: —; Tocantins: —; Maranhão: —; Piauí: —; Ceará: —. and 17 more.
REGISTERED POLL · BA · 2012
BA003002012
Above: Polls 2012Economic Cat Administração Pública, Empresarial e Marketing Ltda2012-municipais
Below: 1 contests concerned
Registered by Economic Cat Administração Pública, Empresarial e Marketing Ltda on Sep 26, 2012; fieldwork from Sep 28, 2012 to Sep 29, 2012, a sample of 400 interviews.
Key figures
Sample
Sample. Unit: value. 1 items. Highest: interviews, 400. Lowest: interviews, 400. Total: 400. interviews: 400.
400
Declared cost
Declared cost. Unit: value. 1 items. Highest: Declared cost, R$3,400. Lowest: Declared cost, R$3,400. Total: 3,400. Declared cost: R$3,400.
R$3,400
Fieldwork days
Fieldwork days. Unit: value. 1 items. Highest: Fieldwork days, 2. Lowest: Fieldwork days, 2. Total: 2. Fieldwork days: 2.
2
Commissioners
Commissioners. Unit: value. 1 items. Highest: Commissioners, 1. Lowest: Commissioners, 1. Total: 1. Commissioners: 1.
1
§ 01Estimates
Results coming soon
Estimates
This poll is registered with the TSE, but its published figures haven't been added to civism yet. Meanwhile, the registration details are below: pollster, sponsor, sample and fieldwork dates.
§ 02Record
Record
Record
Record. Unit: value. 8 items. Institute: Economic Cat Administração Pública, Empresarial e Marketing Ltda; CNPJ: 02.424.348/0001-31; Statistician: Jader da Silva Cedraz; CONRE: 7950; Scope: BA · UE 37478; Offices: Prefeito; Own poll: No; Municipal data: No.
- CNPJ
- 02.424.348/0001-31
- Statistician
- Jader da Silva Cedraz
- CONRE
- 7950
- Scope
- BA · UE 37478
- Offices
- Prefeito
- Own poll
- No
- Municipal data
- No
Timeline
Timeline. Unit: value. 3 items. Registered: Sep 26, 2012; Fieldwork start: Sep 28, 2012; Fieldwork end: Sep 29, 2012.
- Registered
- Fieldwork start
- Fieldwork end
§ 03Who paid
Who paid
Who paid
Who paid. Unit: value. 2 items. Highest: ELEIÇÃO 2012 ROQUE LUIZ DIAS DOS SANTOS PREFEITO, R$0 · -0.00%. Lowest: ELEIÇÃO 2012 ROQUE LUIZ DIAS DOS SANTOS PREFEITO, -R$3 · 100.00%. Total: -3. ELEIÇÃO 2012 ROQUE LUIZ DIAS DOS SANTOS PREFEITO: R$0 · -0.00%; ELEIÇÃO 2012 ROQUE LUIZ DIAS DOS SANTOS PREFEITO: -R$3 · 100.00%.
§ 04Method
Method
Method
Metodologia
Plano amostral
Plano amostral e ponderação quanto a sexo, idade, grau de instrução e nível econ…
Sistema de controle
O sistema de verificação, controle e fiscalização da coleta de dados ocorre em …
§ 05Contests concerned
Contests concerned
Contests concerned
Contests concerned. Unit: value. 1 items. prefeitura-muritiba-ba-2012: Offices: Mayor; Place: muritiba-ba.
| Contests concerned | Offices | Place |
|---|---|---|
| prefeitura-muritiba-ba-2012 | Mayor | muritiba-ba |
§ 06Connections
Connections. Unit: value. 4 items. Highest: Pollsters, 1; Economic Cat Administração Pública, Empresarial e Marketing Ltda. Lowest: Pollsters, 1; Economic Cat Administração Pública, Empresarial e Marketing Ltda. Total: 4. Pollsters: 1; Economic Cat Administração Pública, Empresarial e Marketing Ltda; Elections: 1; 2012-municipais; Contests concerned: 1; prefeitura-muritiba-ba-2012; Place: 1; Muritiba-ba.
- BA003002012
Pollsters1
Elections1
Contests concerned1
Place1